Summit Engineering have always maintained a high invest programme in new
equipment, and will be adding to our Panasonic range in 2007.
Welding of fabrications is labour intensive with welding times varying from operator to operator. The introduction of robotic technology has given us improved weld quality and a dramatic improvement in our welding times. Since the first Robot was installed in 1999, we are now running 22 stations in the UK and 2 in Poland, each station is fully interchangeable but also able to weld it's own set of part sizes.
|
|
 |
|
|
|
|
|
22 welding stations in the UK
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|